Paes - 422-2

: Includes unloading bays, shackling, stunning, slitting/bleeding, scalding, and defeathering. Clean Area

Based on the numbering system of the , here is the most probable identification and a corresponding guide.

Slitting, scalding, defeathering, and evisceration. paes 422-2

: The University of the Philippines Los Baños (UPLB) AMTEC Repository provides the complete 49-page standard.

Interior walls should be smooth and impervious to liquids up to at least 1.8 to 2 meters in height. All wall-to-floor junctions must be "coved" (rounded) with a radius of 50mm to 60mm to eliminate corners where bacteria can grow. : The University of the Philippines Los Baños

For further technical details, professionals often refer to the AMTEC-UPLB portal for the full document. Agricultural Machinery Testing and Evaluation Center design diagrams based on these standards for a specific project?

– Testing center engineers will conduct the 8-hour performance test and safety inspection. For further technical details, professionals often refer to

Must be at least one meter above the ground to facilitate receiving and dispatch. Must have a slope of toward drains to prevent water pooling.